some muppet...... project manager, architect.. whoever :thinking: has completely fecked up on the site I'm running !! /pan
We worked to precise drawings & instructions, & ordered the cable as needed. 4 x 12M 240mm 4 core armoured & 2 x 10M 240mm armoured. plus the usual selection of 150mm singles & earths etc.
The Architect/designer knew EXACTLY where these cables were to be fed from...... right next door in the adjacent server room. :scholar:
How sooo wrong he was. /Grrr
£3,500 of cable has just turned into £35,000 of cable !!! the parallel supply is 140 mtrs away at the sub station !! & to protect the cable, we'll need a minimun 1250AMP switch...... not much change out of £7K for that either !! :afro:
We worked to precise drawings & instructions, & ordered the cable as needed. 4 x 12M 240mm 4 core armoured & 2 x 10M 240mm armoured. plus the usual selection of 150mm singles & earths etc.
The Architect/designer knew EXACTLY where these cables were to be fed from...... right next door in the adjacent server room. :scholar:
How sooo wrong he was. /Grrr
£3,500 of cable has just turned into £35,000 of cable !!! the parallel supply is 140 mtrs away at the sub station !! & to protect the cable, we'll need a minimun 1250AMP switch...... not much change out of £7K for that either !! :afro: