As many of you know, I bought myself a new and pretty clean VR4 last year:
http://www.clubvr4.com/forum/showthread.php?54836
IMAG0304.jpg
I fully intended to underseal it and start swapping parts last year, but due to moving house and being busy with work, it never quite happened. This year we are going on the May Ring Trip and I have decided to make that a dealine for doing a lot of the work on the car that I have been putting off for over a year!
So far I have:
Amsoiled the whole car last year.
Fitted my ancient double din Pioneer (It's now been in six of my cars, originally bought in about 2001!)
Installed new stainless downpipes
Decided to keep the Fujitsubo cat back.
Fitted an Evo 6 de-cat.
Partly sorted my boost issues.
Bought a set of Recaros in the red fleck to match my interior.
Fitted Alpine speakers in all four doors - fronts are components.
Fitted uprated speaker cable to front doors.
Installed the PLX DM-100 with wideband and boost/vac sensors. The display is hidden in the clock window.
Installed a Walbro 255 pump.
Installed a Sard FPR.
Swapped the Evo 9 rims from VOR (my previous VR4)
So, on my list of things to do is:
Underseal using Rust Bullet. I plan to strip the car as far as I can to underseal - most of it is coming apart anyway for the list below, but I also hope to remove the rear subframe and the fuel tank to really get into the difficult to reach areas.
Sound deaden using Silent Coat and felt.
Manual convert, although the final drive ratio will still be an issue for me to resolve at some point.
Install the competition clutch and lightened flywheel I bought from Eurospec.
Install my Brembo setup with Performance Friction floating discs and pads. The Brembos have been powder coated so need rebuilding too.
Install the engine from VOR as the previous owner ported and polished the heads and fitted oversized big end bearings.
Install the ARC intercooler from VOR
Refurbish my Tein Super Wagons with EDFC (the shock bodies are in bad shape after nearly 5 years of salted roads) and install.
Fit the Evo 7 rims I have had powder coated in anthracite.
Possibly fit an SAYC rear diff.
Hopefully tart up the engine bay a little on the way.
Most fluids will have to be done with the work listed above. There are additional service items I will be doing on the way:
Full cambelt service, all pulleys and pump, oils filters and plugs.
New driveshaft seals.
The lists will hopefully change through May - as I intend to have a couple of weeks off work to get all this done. I'm sure I will be adding things I have forgotten to mention or taking things away that I can't get done too. If there is anything in particular anyone wants photos of or if there are ideas that I may have missed please post up and ask!