Hi Joey!
You have an ST with the 1.8 GDI engine, right? Your's is a 4WD already, correct? Auto or manual?
The work involved?
Basically taking out the engine / gearbox assembly as well as the engine wiring loom and the ECU. Afterwards reassemble with new engine/gearbox unit, new ECU and new loom. There you go. I'd guess it'll take two full days of work.
You will need following things:
- engine (of course) with ancillaries (starter motor / alternator)
- wiring loom
- matching ECU
- downpipes
- matching gearbox
- driveshafts
Accidentially I do have all the bit's here, as I have converted my ST-R to a VR-4.
Total mileage is 133,000 kms, engine is dry and runs smoothly. It's pre-assembled with the AT-gearbox (which has been refurbed some 15,000kms ago), sitting on a pallet and waiting for someone to buy.Just let me know if you are interested and drop me a PM.
cheers
Stefan